Grange Power is a peaking power facility located within the Grange Castle Campus in Dublin, developed to support grid stability during periods of peak electricity demand.
Designed to provide rapid-response power generation, the facility strengthens the resilience and reliability of Ireland’s energy infrastructure.
CJK delivered the Electrical and Instrumentation (E&I) package from design development through to commissioning, supporting the successful delivery of this critical energy project.
Scope of Work
- E&I installation from RIBA Stage 3 through to commissioning
- Design coordination through Early Contractor Involvement (ECI)
- Integration of instrumentation and control systems
- Electrical and control systems installation
- Grid connection support
- Testing, commissioning and system integration activities
Project Complexity
- Live integration with existing grid infrastructure
- Rapid-response power generation requirements
- Coordination across mechanical, electrical and control systems
- Integration of critical plant, instrumentation and control systems
- Delivery from design development through to commissioning
Delivery Outcome
- Fully commissioned peaking power facility
- Seamless integration of electrical, instrumentation and control systems
- Infrastructure delivered to support grid resilience and peak demand response
- Project delivered in line with operational and performance requirements